PERKOA - ZINC MINE

  • High-grade Volcanogenic Massive Sulphide (VMS) zinc deposit in Burkina Faso;
  • Ore reserve of 6.3 million tonnes at a mine head grade of 14.5% zinc;
  • Proposed plant throughput of 525,000 tpa to produce 132,000 tpa clean zinc concentrate with 53% grade over a 12.5 year mine life;
  • Contained zinc value >US$2.7 billion at zinc price of US$3,000/t;
  • Exploitation Licence covering all mining activities granted in March 2007;
  • DRA Mineral projects appointed EPC manager;
  • Optimise mine design to enhance mining efficiencies, reduce overall costs and expedite mine schedule to access first ore;
  • Key site contractors appointed including:Perkoa Core 02
    • Byrnecut Mining - Managing contractor for the construction and mining of the underground mine;
    • DRA Mineral projects - Engineering, Procurement and Construction Manager for plant and infrastructure;
    • Xstrata Zinc, Votarantim Metais and Boliden - Concentrate off-take partners;
    • Letters of intent signed by offtake partners, Xstrata Zinc and Boliden;
    • Banlaw Africa – Construction and surface civil infrastructure;
    • Bollore – Transport logistics of ore from site to Port of Adidjan;
    • Outotec (formerly Outokumpu) – Manufacture and supply of Perkoa mill, flotation cells and thickener units;
    • Sandvik – Manufacture and supply of Axera 7 drilling ‘jumbo’ used for the development of the underground mine workings;
    • SHELL – Supply and management of fuel facility;
    • Caterpillar – Supply of diesel generated power station;
    • Caterpillar – Manufacture of underground mining equipment;
    • Sandvik – Supply of crushing and grinding;
    • African Explosives Limited – Supply and management of explosivesNational and Overseas Modular Buildings – Supply of offices, accommodation and changeroom facilities;
    • Allterrain Services Group – Catering and camp management;
    • SOS International – Medical, Emergency and Evacuation;
    • West African Drilling Services/Boart Longyear – Exploration drilling contractors;
    • TOYOTA – Supply of site vehicles.
  • Box cut construction completed in June 2007;
  • Advanced negotiation with potential offtake partners - Votorantim Metais, Xstrata Zinc and Boliden.

mumbwa - GOLD/COPPER PROJECT

  • Interpretation of BHPB’s Falcon™ data with 3D inversions and the application of BHPB’s Solid Earth™ proprietary technology identified anomalous zones over the Kitumba Hills, Worm and Mutoya prospects;
  • Initial 8 hole core drilling program totalling 4,105.17m was completed in February 2007;
  • A major drilling will commence late January 2008. The Company has engaged three drilling rigs to complete 13 cored holes for a total of approximately 9,100 metres.
  • Hole, S36-001, was drilled to a total depth of 697.4m, and intersected mineralisation yielding 655m at 0.46% copper, including:
    • 317m @ 0.79% Cu,
    • 18m @ 0.20g/t Au,
    • 42m @ 2.01% Cu, including
    • 4m @ 5.56% Cu.
    • Soil geochemical survey over drilled anomalies displayed elevated gold response over S36;

MOKOPANE - NICKEL/PLATINUM PROJECT

  • Nickel-Platinum project located on the Northern limb of the Bushveld Complex;
  • Granted new order rightsover 3,000 hectares for exploration purposes;
  • Appointment of Black Economic Empowerment (BEE) party;
  • JORC compliant Inferred Resource of 39.7 million tonnes at 0.146% nickel, 0.085% copper, 0.22 g/t platinum and 0.33g/t palladium;
  • Near surface mineralisation is amenable to low cost, large scale, open pit mining with low strip ratio;
  • Significant potential to increase current resource by additional drilling from all 5 prospects within the licence area;
  • Considering a percussion drilling program to further define the resource status from all 5 prospects.